Drilling


During the last five years in the first and second phase, 16,600 m of surface diamond drilling and 11,345 m of underground diamond drilling has been proposed and drilled to explore the strike and depth continuity of the existing reefs and its adjacent branches, to explore some of the un-correlated lodes and blind ore shoots.

The evaluation of the exploration data has revealed the continuation of the existing reefs and also occurrence of continuation of some un-correlated lodes in the northern and southern part of the existing Hutti mining lease area. This has enhanced the additional possible ore reserves.

Summary of Drill Proved Reserves

Drilling Million Tonnes Grade (g/t)
Surface Diamond Drilling 0.59 4.58
Underground Diamond Drilling 0.88 2.43

These are categorized under Indicated Mineral Resources (332) of UNFC Norm.